When tiling the steps start with the risers.
Tiling concrete steps.
Step 5 place the tiles in order.
Use spacers to achieve consistent gaps between tiles image 2.
Put grout spacers in between each tile to leave areas for the grout to be added later.
Place a tile over the mortar and push it down until it sits flat against the stairs.
How to tile stairs.
A good tiler will want to use the stick fast qualities of a mortar mix before they diminish.
Continue to mix until the texture is creamy.
Then prime the concrete see photo 2 with the recommended solution consult the membrane manufacturer s literature.
Use the flat side of trowel to apply the thin set and the comb edge of the trowel to create grooves image 1.
Tiles meant for indoor use will not work when tiling concrete stairs outdoors.
Consequently use the float until the layer of adhesive is even as to make sure the tile flooring will be perfectly level.
Then let the mortar stand for about 10 minutes to get tacky.
There are many different types of tiles that can be used on concrete steps.
Don t wait longer than 15 20 minutes after you ve finished spreading.
Pour just about an entire bag of the dry mixture into a large bucket.
Add just enough water to get the dry mixture wet and begin mixing.
Set the tiles by gently sliding into place.
Step 1 choose the type of tiles.
Tiles come in many different colors styles shapes and patterns.
Use a self mix thin set mortar for the tile installation.
Making sure to follow manufacturer s instructions allow the membrane to cure.
When tiling the steps start with the risers.
Follow the simple steps below to begin adding tiles to your own concrete steps.
Spread a layer of isolation membrane over the concrete using a notched trowel.
After you have spread the tile adhesive on the floor by using the straight side you have to comb it with the notched side.
Use spacers to achieve consistent gaps between tiles.
You should smooth the surface of the membrane using the flat edge of a trowel.
You ll need to treat every step individually tiling each one completely as you go and working down from the top stair to the bottom.
If needed use the tile cutter to cut any tiles to the proper size.
Cut the membrane so it s 1 1 2 times the width of your tiles.
Apply the tiles to the face of a vertical step riser lining up the upper edge of the tile flush with the edge of the horizontal stair tread and using the mastic trowel to apply mortar to the back of the tiles.
Skip this step and we guarantee your new tile will crack right over the cracks in the concrete.
This will give you a really tight connection to your slab.
Spreading tile adhesive with a float.