Of the screed surface allows the penetration of primers.
Tiling on new screed floor.
These screeds can be applied both bonded directly onto a concrete base or un bonded applied on to a polythene sheet damp proof membrane.
Bal new floor is a standard setting flexible tile adhesive for new cement and concrete floors.
Make sure your screed is completely dry the main pitfall when preparing a new screed floor for tiling is beginning work before the screed is properly dry.
If you have a brand new freshly laid screed floor lay a plastic foil down before installing laminate panels.
How to prepare a new screed floor for tiling.
Tiling onto green screeds or concrete.
Some laminate panels may have built in plastic foils or something similar.
A number of factors can affect how long a newly poured screed floor takes to fully cure and it s important to remember.
Water and frost resistant it can be grouted after 24 hours.
Both screed and concrete are referred to as being green during the period from application through to the time it gains strength and reaches dimensional stability.
The top surface of screeds may need to be scored sanded or keyed in preparation to accept the primer and floor tiling adhesive sanding keying etc.
Screed should be firm enough to walk on before tiling can begin.